INNOVA provided investigative and design services to support the repair and replacement of the HVAC system serving Building 1197, located on Joint Base Lewis-McChord (JBLM), WA. The scope of HVAC system replacement also included work associated with the building electrical systems and architectural finishes, including a full replacement of all ceilings in all areas. The design incorporates electrical changes required for the installation of the new HVAC equipment and included one-line diagrams, panel schedules, and electrical floorplans for the building.