Bellevue, WA
INNOVA worked with the King County Housing Authority and the City of Bellevue to prepare a feasibility study that validated the construction of a new three-story, 36-unit apartment building that will maximize the affordable housing available at the Highland Village site. This property is designed to provide affordable family housing, with a mix of one, two, and three-bedroom units. The building replaces two smaller buildings to maximize the allowable site density, while fitting in with the neighborhood requirements. In addition to the architectural design, INNOVA also provided civil engineering services.